The Ribble Link - Savick Brook and the "new" locks

The Ribble Link from Savick Bridge to the Brook Basin

I left you waiting to find out what happened after our lunch stop on the pontoons before Savick Bridge. Margaret Rose left first, at about 13.20, and negotiated the bridge, which had a sharp bend immediately after it.

Savick BridgeSavick Bridge

Savick Brook is very narrow with high banks for most of the way. It felt as if we were in a cutting and I was grateful it was only one way working - there is not room for two boats to pass!

Savick BrookSavick Brook

The black blob on the left is a carving of a Crow - here it is, close toThe crow

There are what look like water outlets (or inlets) in this sectionOutlet

We arrived at lock 8 in about 15 minutes. Margaret Rose was in and waiting for us.

The BW guys locked us throughLock 8

All the locks are very similar to this one with standard paddle gear and our crew locked us through the remaining four on this section. There is a good towpath and so they were able to walk between the locks which were only about half a mile apart.

The bridges varied in shape and form. Bridge 9 was attractiveBridge 9

After Golf Course Bridge there is a very nasty bend, which we did not manage to get around without reversing. Margaret Rose, following us by now, had the same problem even though they are slightly shorter that our 57 feet!

Ashton and Lea Golf Course BridgeGolf Course bridge

At lock 6 I got off the boat to walk the towpath for some "photographic opportunities"! The bottom paddle gear had its own little platform so the gear could be reached!

Lock 6 bottom paddle gearPaddle bridge

After lock 6 the Brook becomes full of bends again, particularly around Leyland Bridge. The towpath moves away a little, so I did not scramble through the hedge!

I caught up with Epiphany just after she passed under Leyland BridgeEpiphany

Our crew were still full of energy at lock 5!Lock 5

Epiphany came around the last bend before Savick Way Bridge and into the deepest lock yet.

Epiphany in lock 4Lock 4

I decided it was time to get back on the boat. I had had my exercise for the day - a good mile walk! About 10 minutes after the lock is a huge railway bridge that is rather attractive.

Railway BridgeRailway bridge

Immediately after is Tom Benson Way BridgeTom Benson Way bridge

We emerged into a small basin. At first I was a little bewildered, as it appeared to be as far as we could go!

Dead end?Basin

I soon realised that there was more to come!

Ha! More suspense - sorry folks I just can't resist it. We have come to the end of Savick Brook so what happens next?
 
Savick Bridge to Bottom Basin - 1 hour 45 minutes, 3.02 miles, 5 locks
 

Add comment

We do not post anonymous comments or blatant advertising - so don't waste your time!


Security code
Refresh

Blog Calendar

  • 2012 (153)
  • 2011 (387)
  • 2010 (376)
  • 2009 (453)
  • 2008 (116)
  • Click above for a map

    Visitors

    637498
    TodayToday1453
    YesterdayYesterday1503
    This weekThis week4407
    This monthThis month34617
    Copyright © 2012 Narrowboat Epiphany: cruising the UK's inland waterways: rivers and canals. All Rights Reserved.
    Joomla! is Free Software released under the GNU/GPL License.